
Items |
Specification
|
Mai n Steel Frame
|
Column/ Beam
|
Q235, Q345 Welded/ Hot rolled H Section Steel
|
Secondary Frame
|
Purlin/ Bracing
|
Q235 C or Z purlin/ Angle Steel/ Round Bar
|
Main tenance System
|
Roof panel/ Wall panel
|
PPGI single Corrugated Sheet/EPS, Rock wool, PIR, Fiberglass wool panel
|
Insulation
|
Fiber glass wool/PE foam
|
Accessories |
Window
|
Aluminum Alloy Window/PVC Window etc.
|
Door
|
Sliding Sandwich Panel Door/ Rolling Metal Door/ Person Entrance Door
|
Downspout System
|
304 Stainless gutter+ PVC pipe
|
Wind Speed |
100km/s to 300km/s
|
Structure Usage |
Up to 50 years
|
Finish i ng Opti ons |
Alkyd paint/ Epoxy paint/ Hot dip galvanized
|









FAQ:
1.You are manufacture factory or trading company?
We are direct manufacture factory, located in Qingdao,China, very close to Qingdao port. We have strictly quality management system,professional design team,strong production capacity and rich manufacturing experience.
2. How about your quality control?
1) we only cooperate with high-quality raw material suppliers with strength and reputation.and our quality inspection department will conduct10096 strict testing on the raw materials before
entering our factory.
2)our workers are all certified and regular assessed,in this way,we can guarantee the production quality.
3)During the production process, we have three parts:self-inspection,mutual inspection.and workshop inspection.Only qualified product can move to next step.4)Before delivery,inspection working will check everything with delivery list, to ensure that we send you every items and you can install it locally.
3. What's the delivery time?
Usually 30 days. Don't worry about the delivery time at all,we have perfect management plan for each project, then deliver to you on time.
4.Do you offer service for installation?
Yes,But we will provide very detailed installation drawings and videos. Generally,you can install it locally,they are all prefabricated and bolted.Otherwise ,we can also send engineer for guiding installation.
5.What's the payment term?
We have two payment terms.
1)30% advance payment before producing by T/T and 70%6 balance by T/T before shipping.
2)100% irrevoable L/c